Prime Minister Office, Putra Jaya

JTK Consult (JTK) was engaged by Ambang Wira Sdn Bhd (AWSB), the building facilities manager, to undertake a condition audit and defects assessment on both the internal and external elements of the PM’s Office Complex (PMOC) to ascertain the present condition of the building.

The survey focused on the three blocks including car park areas and the garden bridge.

A visual walkthrough survey was also done for the roof of the three blocks. The inspection also included a review of the external architectural finishes and defects associated with the expansion joints.

It was found that there were several defects that were potentially of a structural nature which required further monitoring and assessment.

thumbnail
Location
Putrajaya, Wilayah Perseketuan
Client
Ambang Wira Sdn Bhd
Year
2009
Services We Provided

Forensic Engineering and Remedial Solutions:
structural audit and identification  of the problems

Ref: 1204/09/ r7262


Notice: Undefined index: jtk_current_cat in /home/jtkconsul/public_html/wp-content/themes/weblizar/single-project.php on line 106
Next Prev