LCCT Sepang Selangor

We were engaged by Scancem Materials Sdn Bhd and Zack Lim Sdn Bhd to provide an alternative design approach to the construction of the Apron Slabs of the Low Cost Terminal which involved the use of steel fibre reinforced concrete and a fast track construction approach. We also supervised the works and assisted with the overall construction approach in terms of an appropriate sequence and concrete QA/QC.

The construction works were successfully undertaken and the steel fibre concrete apron provided an appropriate solution which is durable and could be built on a fast track basis.

thumbnail
Location
Sepang
Client
Scancem Materials Sdn Bhd
Year
2004
Services We Provided
Ref: 1114


Notice: Undefined index: jtk_current_cat in /home/jtkconsul/public_html/wp-content/themes/weblizar/single-project.php on line 106
Next Prev