24 LRT Stations Ampang Line, Klang Valley

JTK Consult (JTK) was engaged by Syarikat Prasarana Negara Berhad as part of a consultancy team under the lead Architectural Consultant Arca 3 Arkitek Sdn Bhd to undertake the analysis and design of the civil and structural portions of the works. This involved Refurbishment and Upgrading Works for 24 LRT Stations on the existing Ampang Line. This also included the integration of 2 LRT stations namely Hang Tuah Station and Bandar Tasik Selatan Station to the existing monorail station and commuter station respectively.

The design analysis was carried out using STAADPro and the works involved strengthening the existing structures with innovative methods so as to minimise the disruption to the running operations and in some cases the design of the new extensions to the LRT stations.

The overall supervision works were completed in 2013.

thumbnail
Location
Ampang Line Lrt Stations, K.L.
Client
Arca 3 Arkitek Sdn Bhd.
Year
2009-2013
Services We Provided

Structural Design and Technical Support:
fast track steel design